Project Manager: Gregory C. Bostard Jr., P.E.
Project Value: $6.7 Million
The Plug Power Hydrogen Production Facility Project located in the town of Alabama, New York within the Science & Technology Advanced Manufacturing Park will produce 75 metric-tons-per-day (mTPD) of green hydrogen.
Mark Cerrone, Inc. was responsible for site clearing, topsoil stripping, and earthwork cuts and fills to subgrade. Additional services included installing the storm piping system and the building pad and roadway subbase stone, as well as building a bioretention pond. Some key features include 130,000 CY of fill, 30,000 CY of topsoil stripping, 70,000 CY of subbase stone, and approximately a mile of storm water piping.